Requirements:
Tools: what needed? Have avialable.
need all required materials present (what are required?)
- Lag bolts and drill bits for lag bolts
- What length lags bolts? How many?
- What is the detail for the handrail post to stringer attachment (what hole through handrail (diameter)? how deep and what diameter for pilot holes for stringer?
Confirmation of attendees
Food & water?
Safety Supplies
Build plans and sequence