Requirements:

Tools: what needed? Have avialable.

need all required materials present (what are required?)

  • Lag bolts and drill bits for lag bolts
  • What length lags bolts? How many?
  • What is the detail for the handrail post to stringer attachment (what hole through handrail (diameter)?  how deep and what diameter for pilot holes for stringer?

Confirmation of attendees

Food & water?

Safety Supplies


Build plans and sequence